AS9102 Rev C pre-submission checklist

Most First Article Inspection rejections come from clerical mismatches, missing certificates or unballooned drawing notes rather than bad machined parts. Walk through these 12 checks before sending a FAIR package to your customer.

Form 1 — Part Number Accountability

  1. Match drawing and part revision levels everywhere: Verify that the Part Number, Part Name, Serial Number, FAIR Identifier and Part/Drawing Revisions (Form 1 Fields 1–7) match the purchase order, the exact ballooned print revision, and every sheet of Forms 2 and 3.
  2. Document Full vs. Partial FAIR scope clearly: If submitting a Partial FAIR (Field 14), always populate the baseline part number, baseline revision, baseline FAIR identifier and the specific reason for the delta (for example, drawing rev change or tooling relocation).
  3. Check Detail vs. Assembly index completeness: For assemblies, list every sub-tier detail part and standard catalog component in Fields 15–18 with its corresponding FAIR identifier or exception.
  4. Confirm verification, review and approval authority: Ensure Fields 20–25 are signed and dated by qualified personnel only after all measurements, certificates and documented nonconformances (Field 19) are finalized.

Form 2 — Materials, Special Processes & Functional Tests

  1. Account for every raw material and special process on the print: Cross-check title block material callouts, drawing notes (heat treat, anodize, passivation, NDT, weld, paint) and customer specs.
  2. Verify customer-approved special processor status: Form 2 Field 9 requires confirming whether the customer mandates an approved supplier list (Yes / No / N/A) — do not leave it blank or blindly mark N/A.
  3. Attach legible, traceable certificates of conformance: Check that heat/lot numbers on mill certs and plating certs (Field 10) tie directly to the shop traveler or manufacturing process reference in Form 1.

Form 3 & Ballooned Drawing — Characteristic Accountability

  1. One-to-one balloon alignment: Every numbered balloon on the PDF print must have a matching row in Form 3, and every row in Form 3 must point to a visible balloon and accurate drawing zone.
  2. Do not skip general notes, threads, finishes and break-edge requirements: Inspectors often balloon dimensions and forget general drawing notes, surface roughness symbols, deburr notes or thread callouts.
  3. Verify general tolerance blocks and standard editions: When applying title-block tolerances or ISO 2768-1:1989, confirm the drawing explicitly invokes that class and edition instead of assuming defaults.
  4. Record real measured values — never copy nominal: Report actual readings (including multi-hit ranges for counted features like 4X Ø6.6), units and measuring equipment where required. For GD&T position callouts with MMC/LMC bonus, verify the feature size with our true position calculator.
  5. Flag nonconformances explicitly: Any out-of-tolerance characteristic requires a documented nonconformance reference in Form 3 (Nonconformance Number) and matching status on Form 1 Field 19.