AS9102 Rev C pre-submission checklist
Most First Article Inspection rejections come from clerical mismatches, missing certificates or unballooned drawing notes rather than bad machined parts. Walk through these 12 checks before sending a FAIR package to your customer.
Form 1 — Part Number Accountability
- Match drawing and part revision levels everywhere: Verify that the Part Number, Part Name, Serial Number, FAIR Identifier and Part/Drawing Revisions (Form 1 Fields 1–7) match the purchase order, the exact ballooned print revision, and every sheet of Forms 2 and 3.
- Document Full vs. Partial FAIR scope clearly: If submitting a Partial FAIR (Field 14), always populate the baseline part number, baseline revision, baseline FAIR identifier and the specific reason for the delta (for example, drawing rev change or tooling relocation).
- Check Detail vs. Assembly index completeness: For assemblies, list every sub-tier detail part and standard catalog component in Fields 15–18 with its corresponding FAIR identifier or exception.
- Confirm verification, review and approval authority: Ensure Fields 20–25 are signed and dated by qualified personnel only after all measurements, certificates and documented nonconformances (Field 19) are finalized.
Form 2 — Materials, Special Processes & Functional Tests
- Account for every raw material and special process on the print: Cross-check title block material callouts, drawing notes (heat treat, anodize, passivation, NDT, weld, paint) and customer specs.
- Verify customer-approved special processor status: Form 2 Field 9 requires confirming whether the customer mandates an approved supplier list (Yes / No / N/A) — do not leave it blank or blindly mark N/A.
- Attach legible, traceable certificates of conformance: Check that heat/lot numbers on mill certs and plating certs (Field 10) tie directly to the shop traveler or manufacturing process reference in Form 1.
Form 3 & Ballooned Drawing — Characteristic Accountability
- One-to-one balloon alignment: Every numbered balloon on the PDF print must have a matching row in Form 3, and every row in Form 3 must point to a visible balloon and accurate drawing zone.
- Do not skip general notes, threads, finishes and break-edge requirements: Inspectors often balloon dimensions and forget general drawing notes, surface roughness symbols, deburr notes or thread callouts.
- Verify general tolerance blocks and standard editions: When applying title-block tolerances or ISO 2768-1:1989, confirm the drawing explicitly invokes that class and edition instead of assuming defaults.
- Record real measured values — never copy nominal: Report actual readings (including multi-hit ranges for counted features like
4X Ø6.6), units and measuring equipment where required. For GD&T position callouts with MMC/LMC bonus, verify the feature size with our true position calculator. - Flag nonconformances explicitly: Any out-of-tolerance characteristic requires a documented nonconformance reference in Form 3 (Nonconformance Number) and matching status on Form 1 Field 19.