PPAP submission levels (1–5) & 18-element checklist

Check which of the 18 AIAG PPAP elements must be submitted to your customer (S), retained on site (R) or defined by customer-specific rules (*) for Levels 1 through 5.

Select your customer's PPAP submission level

PSW with product samples and complete supporting data. Level 3 is the default AIAG submission level unless the customer specifies otherwise.

Submit to customer (S)
16 elements
Retain on file (R)
2 elements
Customer-defined (*)
0 elements
AIAG 4th Edition 18 elements — requirements for Level 3
#PPAP elementActionWhat inspectors check
1Design RecordsS · Submit to customerAuthorized drawing, CAD model or specification (plus ballooned print matching dimensional results).
2Engineering Change DocumentsS · Submit to customerAuthorized engineering change notices not yet incorporated into the design record.
3Customer Engineering ApprovalS · Submit to customerEvidence of customer engineering approval when specified by the design record.
4Design FMEA (DFMEA)S · Submit to customerFailure Mode and Effects Analysis when the organization has design responsibility.
5Process Flow DiagramsS · Submit to customerSequence of manufacturing, inspection and packaging operations from receiving to shipping.
6Process FMEA (PFMEA)S · Submit to customerProcess Failure Mode and Effects Analysis covering every manufacturing/inspection step.
7Control PlanS · Submit to customerWritten summary of process controls, inspection methods, sample sizes and reaction plans.
8Measurement System Analysis (MSA) StudiesS · Submit to customerGage R&R, bias, linearity and stability studies for measurement equipment in the Control Plan.
9Dimensional ResultsS · Submit to customerMeasured values for every ballooned characteristic on the design record across required sample pieces.
10Material / Performance Test ResultsS · Submit to customerRaw material mill certs, special process certs and functional/performance test reports.
11Initial Process StudiesS · Submit to customerShort-term capability studies (Cpk / Ppk) on special characteristics designated by customer or team.
12Qualified Laboratory DocumentationS · Submit to customerScope and accreditation (e.g. ISO/IEC 17025) for internal or external testing laboratories used.
13Appearance Approval Report (AAR)S · Submit to customerRequired when the part has customer-specified color, grain, gloss or appearance criteria.
14Sample Production PartsS · Submit to customerPhysical sample parts taken from the significant production run.
15Master SampleR · Retain at manufacturing siteSigned/dated physical reference sample retained for operator comparison (when applicable).
16Checking AidsR · Retain at manufacturing sitePart-specific fixtures, templates, mylars or attribute gages used in production inspection.
17Records of Compliance with Customer-Specific RequirementsS · Submit to customerEvidence fulfilling OEM-specific quality addenda (CSR).
18Part Submission Warrant (PSW)S · Submit to customerSummary sign-off form declaring part conformance, submission reason, weight and level.

How PPAP dimensional results link to your ballooned drawing

Element 1 (Design Records) and Element 9 (Dimensional Results) require a ballooned print where every characteristic number matches the dimensional results table across all submitted sample parts. Always verify customer-specific requirements (CSRs) and any OEM-mandated warrant format before final approval.

Prepare PPAP working copies from your ballooned drawing

BalloonFAI Pro pairs your ballooned PDF and Form 3 requirements with CMM measurement import (CSV, PC-DMIS, Q-DAS, ZEISS CALYPSO) and multi-sample PPAP working copies containing a warrant draft, evidence index and sample matrix.